tender value not available in bihar
bihar , hajipur
- East Central Railway
- set of spares to ftrtipl make compressor (ftrtipl pt no-790850302) as per annexure attached.
- Deadline : 06 Jun 2025
- Updated : 09 May 2025
- Value : Refer Document
- Download
bihar , samastipur
- East Central Railway
- supply of switch 6 a-250 v
- Deadline : 20 May 2025
- Updated : 09 May 2025
- Value : Refer Document
- Download
bihar , hajipur
- East Central Railway
- supply of fuel pipe oem:de part no:0148-20-112, hsn code-73182990,
- Deadline : 19 May 2025
- Updated : 09 May 2025
- Value : Refer Document
- Download
bihar , hajipur
- East Central Railway
- supply of gear oil
- Deadline : 20 May 2025
- Updated : 09 May 2025
- Value : Refer Document
- Download
bihar , hajipur
- East Central Railway
- portable digital ultrasonic flaw detector along with standard accessories as per rdso specification no. m&c/ndt/125/2004, rev-ii, jan. 2017. ( procurement through rdso approved sources only).
- Deadline : 20 May 2025
- Updated : 09 May 2025
- Value : Refer Document
- Download
bihar , samastipur
- East Central Railway
- supply of chisel hexagonal chrome vanadium 10 inch
- Deadline : 20 May 2025
- Updated : 09 May 2025
- Value : Refer Document
- Download
bihar , katihar
- Northeast Frontier Railway
- supply of tapper gauge stainless steel
- Deadline : 15 May 2025
- Updated : 09 May 2025
- Value : Refer Document
- Download
bihar , katihar
- Northeast Frontier Railway
- supply, installation, testing and commissioning of the 6 passenger elevator with 3 stops without machine room as per specification-282-kone i mono space r 24.1-1 (a. price validity 12 months from date of signing order, b. warranty 24 months from date
- Deadline : 28 May 2025
- Updated : 09 May 2025
- Value : Refer Document
- Download
bihar , katihar
- Northeast Frontier Railway
- outsourcing of manpower for maintenance activities of 4 nos electrified tunnel between skap-agtl ( namely longtarai tunnel-tunnel no. o 3 atharamuraa tunnel-tunnel no. 04, baramura tuneel-tunnel no.05) and agtl-sbrm section
- Deadline : 30 May 2025
- Updated : 09 May 2025
- Value : Refer Document
- Download
bihar , samastipur
- East Central Railway
- supply of board terminal tb 32 aa, b, c-bpt
- Deadline : 16 May 2025
- Updated : 09 May 2025
- Value : Refer Document
- Download